googleads

Building Features

6 levels of offices6 levels of offices with toilet blocks within each office
disaster managementEstablished disaster management program
securityHigh-end security
Controlled accessControlled access
6 High-end elevator6 High-end elevator management system with auto rescue devices and minimal waiting time
Separate freight elevatorsSeparate freight elevators
car parkSurveillance in car park and common areas
evacuationMultiple evacuation points
fire detectionHigh-end fire detection and fighting systems
HVAC systemsSpecially planned ducts for ventilation and HVAC systems
Advanced integrated building managementAdvanced integrated building management system
3 phase power3 phase power supply through supper feeders ensuring 100% redundancy
DG back-upDG back-up for common area and emergency services
RO plant and treated water supplyRO plant and treated water supply
Rain water harvestingRain water harvesting
Sewage treatment  plantSewage treatment plant
Recycling and segregation of wasteRecycling and segregation of waste